VCP4: Difference between revisions

From vwiki
Jump to navigation Jump to search
Line 19: Line 19:


== Section 4 – Install and Configure vCenter Server ==
== Section 4 – Install and Configure vCenter Server ==
* '''Minimum Requirements'''
'''Minimum Requirements'''
** 2x CPU's (2GHz)
* 2x CPU's (2GHz)
** 3GB RAM  
* 3GB RAM  
** 2GB disk
* 2GB disk
** Microsoft SQL2005 Express
* Microsoft SQL2005 Express


{|cellpadding="4" cellspacing="0" border="1"
{|cellpadding="4" cellspacing="0" border="1"
Line 35: Line 35:
| 300 ESXs, 3000 VMs  || 64 bit || 4  || 8 GB  
| 300 ESXs, 3000 VMs  || 64 bit || 4  || 8 GB  
|}
|}
* Database must be 32bit only, regardless of VC's OS (default database on 64bit SQL is 64bit)


[[Category:VMware]]
[[Category:VMware]]

Revision as of 09:36, 2 November 2009

Other Resources

Notes

Section 1 – Plan, Install and Upgrade VMware ESX/ESXi

Minimum Hardware Requirements

  • 64bit CPU (AMD Opteron, Intel Xenon [inc Nahalem])
    • CPU Virtualisation features required to support 64bit VM's
  • 2GB RAM
  • 1+ NIC
  • SCSI, Fibre Channel or Internal RAID controller
  • LUN, SAS or SATA (SATA must be connected through a SAS controller)

Notes

  • ESX's hardware clock should be set to UTC
  • IPv6 not supported during installation

Section 4 – Install and Configure vCenter Server

Minimum Requirements

  • 2x CPU's (2GHz)
  • 3GB RAM
  • 2GB disk
  • Microsoft SQL2005 Express
Scale VC CPU Memory
50 ESXs, 250 VMs 32 bit 2 4 GB
200 ESXs, 2000 VMs 64 bit 4 4 GB
300 ESXs, 3000 VMs 64 bit 4 8 GB
  • Database must be 32bit only, regardless of VC's OS (default database on 64bit SQL is 64bit)